Read the Field work report
The Field work report shows the work your crews did in the field, one line per person: visits and jobs completed, hours on site beside the planned hours, return visits and reopened jobs. Open Menu, then Field work report.
Owners, admins and dispatchers see it. Sales reps and installers don't.
Where the hours come from
Hours on site come from the crew's taps in the Wye app: the time from a person's On site tap to their Done tap on a visit. They aren't from timesheets; Wye has no time clock.
- Each person's own taps count for them. If someone booked on the visit sent no taps of their own, the office's Mark on site and Mark done on the dispatch board count for them instead.
- If a person left the site and came back, both stretches are added up. A repeated On site tap while already on site, or a second Done, counts once. An On site tap more than 24 hours after the last one is a new arrival, so the visit counts as missing an event, not as one long stretch.
- A visit whose taps don't pair up for a person, such as a Done with no On site before it, an On site never followed by Done, or no taps at all, is counted under Visits missing an event and adds no hours. Wye never guesses the missing time.
Planned hours are each visit's booked length on the board. The table shows them twice: for the visits that have hours on site, which is the fair comparison with the hours on site, and for every completed visit.
The figures
- Visits completed: visits marked done in the range, in the app or on the board, counted on the day of that tap. A visit that was never marked done isn't in the report; the dispatch board still shows it.
- Jobs completed: jobs completed in the range. A person's line counts the jobs they had a visit marked done on.
- Return visits: completed visits that came after an earlier visit of the same job was marked done. A planned second day of a long install counts too.
- Jobs reopened: jobs the office reopened in the range. A person's line counts the reopened jobs they had a visit marked done on.
Two people on one visit
Each person booked on a visit gets the visit on their line, with their own time on site. In the Total line each visit and each job counts once, so the people's lines can add up to more than the total. Hours are added up over people: a 3-hour visit with two people on site adds 6 hours to the total, and its planned hours count for each person too, so the two stay comparable.
Visits with no one booked are on a No one booked line. A job completed or reopened with no booked person's visit counts in the total only.
The table and the charts
- By technician has one line per person with something in the range, and the total at the bottom.
- Hours by technician shows hours on site beside the planned hours for the same visits. Visits by technician shows visits completed, visits missing an event and return visits.
To choose the range or export a table, see Use the reports.